November
With floorboards lifted, holes and channels all over the walls, and wires sticking out all over the place, the place looks like a proper building site now.
It’s all fine. It’s OK. We just have to break it down a bit before we can build it back up, better. In this case, with lights where we actually want them, more than one socket in a room, and circuits for new efficient appliances and renewables kit. Oh, and an electrics board with trip switches, rather than a fuse box with actual fuses.