OK, assembling these flat packs was fun 🙂
Walls painted. Natural paint: Auro, via Greenshop Paints.
Rails fixed to walls. Nice and level, then fixings tightened.
Cupboards hung on rails. Discover the rails aren’t perfectly level. Tweak.
Floor anchor for the ‘peninsula’, where the base units are not back against the wall. Before drilling in to the floor, check very carefully where the underfloor heating pipe is. (We left unheated areas where cupboards were planned so it doesn’t slow cook the food in our pantry.)
That lovely piece of marine ply on the right was destined to replace the asbestos soffits before that plan was abandoned; it’s now being repurposed as a back panel of the peninsula. It will be stained & oiled with Osmo oil (similar to the boxed in pipe).




